Monday, 17 March 2014

Fitting the vertical arms

View from bucket-wheel end


Awaiting vertical arms

View of winding drums from below

All set to install vertical arms
Lifters at the ready!
Front vertical arm going up


On the way up
Safely at 9 feet

Manoeuvering the front vertical arm into position





Moving front vertical arm forward into position


Putting M10 bolts in place

Mission accomplished, Part 1
Sending 2nd vertical arm upwards
Getting 2nd arm into position


Another bolter at work

Just enough head room!
Attaching service crane
Service crane at ceiling height (about 17 feet) on top of back vertical arm

View from below - service crane in place on top of  2nd vertical arm

Mission accomplished, Part 2!
Whew! Now for the cables





Sunday, 2 March 2014

Adding the horizontal arms

Planning the first move



Swinging counterbalance arm into position

Thinking it through

Counterbalance arm almost there



Adjusting level of counterbalance arm


Getting it right

Winding-drum area now 9 feet up
Bringing bucket-wheel arm across


Adjusting swivelling pin position
Inspecting the afternoon's work

Bucket-wheel from below


Both arms installed




View from below - bucket-wheel arm



The team of heavy-lifters relaxes



Thursday, 27 February 2014

Almost completed

Bagger 288 is nearing completion! Next step is to assemble all the sections - a major logistical operation needing lots of strong people.
 Watch this space. 
Should be up and running within a month.

Rear crawlers and cable harness


Suspension of 500Kg plus component

Front crawlers

Another view of front crawlers

One of four slewing motor gear boxes

Two slewing motors on upper rotating ring

View of central unit from the rear

View from above with cable harness to be connected

Rear side view

Front view

Components to be assembled

Another view of components
Central unit awaiting rotating ring