Showing posts with label vertical arms. Show all posts
Showing posts with label vertical arms. Show all posts

Monday, 17 March 2014

Fitting the vertical arms

View from bucket-wheel end


Awaiting vertical arms

View of winding drums from below

All set to install vertical arms
Lifters at the ready!
Front vertical arm going up


On the way up
Safely at 9 feet

Manoeuvering the front vertical arm into position





Moving front vertical arm forward into position


Putting M10 bolts in place

Mission accomplished, Part 1
Sending 2nd vertical arm upwards
Getting 2nd arm into position


Another bolter at work

Just enough head room!
Attaching service crane
Service crane at ceiling height (about 17 feet) on top of back vertical arm

View from below - service crane in place on top of  2nd vertical arm

Mission accomplished, Part 2!
Whew! Now for the cables





Thursday, 24 January 2013

The vertical arms

Both vertical arms have been constructed, the longer being 9 feet long and is shown below:
Vertical arm

Visible in the above picture are the bearing boxes for 16 four inch diameter aluminium pulleys which allow the main bucket-wheel arm to be raised and lowered by cables onto 2 winding drums at the far end of the counter-balance arm (which has yet to be built).
Bearing box for aluminium pulleys at top of vertical arm




The 2 vertical arms can be clearly seen to the right of the bucket-wheel