The story of the construction of this (hopefully record-breaking) meccano model
Friday, 13 June 2014
Monday, 14 April 2014
Monday, 17 March 2014
Fitting the vertical arms
| View from bucket-wheel end |
Awaiting vertical arms
|
| All set to install vertical arms |
| Lifters at the ready! |
Front vertical arm going up
|
| Manoeuvering the front vertical arm into position |
| Moving front vertical arm forward into position |
Putting M10 bolts in place
|
| Another bolter at work |
| Just enough head room! |
| Attaching service crane |
| Service crane at ceiling height (about 17 feet) on top of back vertical arm |
View from below - service crane in place on top of 2nd vertical arm
|
| Whew! Now for the cables |
Monday, 3 March 2014
Sunday, 2 March 2014
Adding the horizontal arms
| Planning the first move |
| Swinging counterbalance arm into position |
| Thinking it through |
| Counterbalance arm almost there |
| Adjusting level of counterbalance arm |
| Getting it right |
| Winding-drum area now 9 feet up |
| Bringing bucket-wheel arm across |
| Adjusting swivelling pin position |
| Inspecting the afternoon's work |
| Bucket-wheel from below |
| Both arms installed |
| View from below - bucket-wheel arm |
| The team of heavy-lifters relaxes |
Thursday, 27 February 2014
Almost completed
Bagger 288 is nearing completion! Next step is to assemble all the sections - a major logistical operation needing lots of strong people.
Watch this space.
Should be up and running within a month.
| Rear crawlers and cable harness |
| Suspension of 500Kg plus component |
| Front crawlers |
| Another view of front crawlers |
| One of four slewing motor gear boxes |
| Two slewing motors on upper rotating ring |
| View of central unit from the rear |
| View from above with cable harness to be connected |
| Rear side view |
| Front view |
| Components to be assembled |
| Another view of components |
| Central unit awaiting rotating ring |